Gateway update.

Our installation team have been busy over the last six weeks installing the Guldmann GH1 systems to the Gateway project in Middlesbrough. All of the track systems have been suspended  from the above floor slab up to a 4 metre drop. Here are some examples of the teams work. With the use of the Guldmann integrated rail system all brackets and fixings are out of sight leaving a neat flush fitting track. Nice work!

             

Track  with a 4 metre drop over pool.                       Track with a 1 metre drop in bedrooms.

 

All supporting brackets now out of sight using the integrated rail system.

Contact us today to find out how our products and services can improve the wellbeing of your patients and staff.

  • Approved Code
  • bhta
  • Chas
  • Committed to CSCS
  • Construction line
  • niceic
  • iso-1001
  • iso-9001